Progress
The live company register, the roadmap and the build log.
Progress, without the theatre.
Complete means every applicable gate has passed. A responding page is useful evidence, but it is not the same thing as a complete product.
Live register
applicability-v2-wired-gate
- Complete
- 39of 333
- In progress
- 294
- Average completion
- 88.9%
A named public route exists
The product surface is reachable
The promised job has evidence
Applicable enquiries reach the company
Applicable payment flow is verified
Proof is recorded against the completion standard
Scope: Active company product and platform estate excluding the separately governed GhostWire suite. The figures are generated from the company register at build time, not estimated from marketing pages.
Dated completion register for products active for completion, excluding the separately governed GhostWire scope. This subset is not the full product inventory, and an excluded product is not counted as completed.
The path ahead.
-
Phase 1
Foundation — in place
Shared infrastructure, the completion register and the first customer-facing products are operating. Each product now advances against the same evidence-based standard.
2026 -
Phase 2
Completion — where we are now
Live pages are being converted into complete products, product by product: functional proof, lead capture, checkout, onboarding and benchmark evidence.
2026–2027 -
Phase 3
Distribution
Completed products move into repeatable sales, publishing and partner channels with measured conversion.
2027–2028 -
Phase 4
Scale
Proven products expand across markets and company-owned infrastructure without lowering the completion standard.
2028+
From the build log.
Engineering notes, product updates and estate news — written by the people who build.